Solar projects involve more than designing a system and installing panels. Between signing a contract and receiving Permission to Operate (PTO), installers have to manage plan sets, permits, utility paperwork, financing documents and several other tasks.
When these tasks are handled manually, even a small delay can hold up the next stage of a project. Solar back office automation can help installers manage this work more efficiently.
With AI, teams can automate repetitive tasks such as plan-set checks, permit research, document preparation and project follow-ups. This gives employees more time to handle decisions that require their experience and attention.
9 solar back-office tasks you can automate with AI
Here are nine back-office tasks Wattsun by Solar Agent Hub can help solar companies manage. These cover different stages of a project, from checking plan sets to tracking permits and reviewing financing documents.
1. Plan-set QC against your own checklist
Plan-set QC is a natural first task because your checklist already holds the rules. A manual pass takes a trained reviewer 45 to 60 minutes, by Solar Agent Hub's count. AI checks the set against your checklist and returns each issue with its sheet and the code it breaks. Your designer decides what gets fixed.
2. Permit rule research for an address
Permit research starts over with every address. AI can research an address's permit rules and report what it found. Rules vary by AHJ, so your permit lead reviews the result before it shapes a submittal.
3. Utility and interconnection paperwork
Every utility wants the same project data in its own layout. AI can fill the utility and interconnection paperwork so your team starts from a completed draft. Someone checks the fields before anything goes to the utility.
4. Single-line and three-line diagrams
SLDs and three-line diagrams are drafting work that repeats on every job. AI can draw both, so your design lead starts at review. The design lead checks each diagram before it goes into a plan set.
5. Site survey and install photo review
Survey packets and install photos arrive in batches, and each needs a careful look. AI can review them and point out what looks incomplete or off. Someone who knows the site decides what happens next.
6. Financier milestone packs
A milestone pack can stall on one missing document. AI can build the pack for each milestone and find which financier documents are missing before submission. Your finance lead signs off.
7. Permits stalled more than 7 days
A permit that hasn't moved in a week is easy to miss. AI can flag any permit stalled more than 7 days and give your permit lead a short follow-up list to work.
8. BOM against inventory
A BOM check against stock is a straight comparison. AI can pull the BOM from approved plans and compare it with inventory. Purchasing gets the shortages and decides what to order.
9. Missing homeowner info
Missing homeowner info slows every step after the sale. AI can audit project records for missing homeowner details and list the gaps by project. Your coordinator then asks for everything at once.
What a person still decides
AI can help with repetitive back-office work, but some decisions still belong to your team.
- Final submissions: Your team decides whether a document is ready to be sent, uploaded or submitted.
- Local requirements: AHJ, utility and state requirements can vary. Your permit and design teams need to check the relevant rules.
- Unclear information: If project files contain conflicting details or missing information, someone needs to clarify them before the work continues.
How to start with solar back office automation
Wattsun coordinates a back-office task from the initial request to the final review. Here's how the process works.
- Find the task that causes delays. Look at which activities take the most time or hold up other project work.
- Document the process. Write down the steps, requirements and checklist your team currently follows.
- Assign someone to review the results. Decide who will check the automated output before it is used.
- Test it on a few projects. Compare the results with your team's usual process.
- Update the instructions when needed. If the results miss something, review the checklist and make the necessary changes.
The quality of the results depends on how clearly the process and requirements are defined.
How Wattsun handles a back-office job, step by step
Wattsun runs every job in the same order, and you approve anything that leaves.
- Start with a request. Describe the task you need help with in plain language.
- The right specialist handles it. Wattsun assigns the work to the relevant specialist or combines specialists when needed.
- Your existing instructions are used. Add your SOPs and checklists so Wattsun can refer to them when handling tasks.
- It asks when details are unclear. If multiple files or answers could apply, Wattsun stops and asks for clarification.
- Review the completed work. For example, a plan-set check can return a list of flagged issues with the relevant sheet and code.
- You approve what goes out. Nothing is sent, uploaded or submitted until someone approves it on an approval card that shows exactly what will happen. Every run leaves a record of who ran it, what changed and who approved.
- Schedule recurring work. For example, you can set up a daily check for permits that have not moved forward.
Where Should Solar Installers Start?
Start by looking at the back-office task that takes the most time or regularly delays a project. Document how your team handles it, set clear review steps and test automation on a few projects. Once the process works well, you can look at other tasks that could be handled in the same way.
To see how Wattsun can help with these tasks, book a demo.
FAQ
What is solar back office automation?
Solar back office automation means using AI to take the first pass on repeat, rules-based work between contract and PTO, like plan-set QC, permit research, interconnection paperwork and financier packs. The AI hands back findings or a filled draft. A person on your team reviews it and approves anything before it is sent, uploaded or submitted.
Which back-office task should a solar installer automate first?
Start with a task your team does every week that already has written rules. Plan-set QC is a good candidate because the checklist exists and a manual pass takes a trained reviewer 45 to 60 minutes. Write down the checklist your best reviewer uses, name who approves the output, and compare results on a few jobs first.
Will Wattsun send or submit anything without approval?
No. Wattsun doesn't send, upload or submit anything until a person approves it on an approval card that shows exactly what will happen. If more than one file or answer could fit, Wattsun stops and asks instead of picking one. Every run also leaves a record of who ran it, what changed and who approved.
Can AI keep up with different AHJ and utility rules?
AI can research permit rules for an address and fill utility and interconnection paperwork, but rules vary by AHJ, utility and state, and they change. Treat the output as a first pass for your permit or design lead to check. Wattsun also works from the SOPs and checklists you upload, so your corrections apply to every job after that.
How long does setup take, and how does pricing work?
According to Solar Agent Hub, setup takes under five minutes, and Wattsun works with the tools your team already uses. There is one plan per company, with free seats and all specialists included. You can also see the cost of a task before starting the run.
How long does setup take, and how does pricing work?
According to Solar Agent Hub, setup takes under five minutes, and Wattsun works with the tools your team already uses. There is one plan per company, with free seats and all specialists included. You can also see the cost of a task before starting the run.